
Kitchen Remodeling
in Vancouver, WA
From a single-day hardware swap to a full gut remodel — Norbilt handles every level of kitchen remodeling in Clark County. Cabinets, countertops, backsplash, fixtures, and full layout changes. Licensed WA contractor. 1-year workmanship warranty.
Ready to start? (360) 216-9920
How Much Does a Kitchen Remodel Cost in Vancouver WA?
Prices below reflect installed cost — labor and materials — for Clark County projects in 2026. Appliances are not included in any range. Your actual quote depends on cabinet spec, countertop material, and whether the layout changes.
| Project Scope | 2026 Range |
|---|---|
| Hardware & Fixture Swap | $400–$1,500 |
| Backsplash Installation | $800–$3,000 |
| Countertop Replacement | $2,000–$8,000 |
| Cabinet Reface | $3,000–$8,000 |
| Mid-Range Kitchen Remodel | $12,000–$28,000 |
| Full Gut Kitchen Remodel | $25,000–$55,000 |
| High-End Custom Kitchen | $55,000–$100,000+ |
Ranges cover labor and standard materials. Appliances are owner-supplied. Premium countertops (quartzite, marble), custom cabinetry, and layout changes increase cost. Permits ($150–$600) are additional when required.
What Actually Determines Kitchen Remodel Cost
Two kitchens with the same square footage can be $15,000 apart in cost. Here's what drives the difference.
Cabinets — 30–40% of Budget
Cabinets are the single biggest line item in most kitchen remodels. Stock cabinets from a big-box supplier run $100–$300 per linear foot installed. Semi-custom cabinets (more size options, better wood) run $300–$600. Full custom cabinetry starts at $600 per linear foot and has no ceiling. The cabinet decision alone can swing your total budget by $10,000–$30,000.
Countertops
Laminate countertops cost $20–$50 per square foot installed — the lowest-cost option and far more durable than people expect. Quartz (engineered stone) runs $80–$150 per square foot installed and is the most popular mid-range choice. Natural stone — granite, marble, quartzite — starts at $100 and runs well past $200 per square foot depending on the slab. A standard kitchen has 50–80 square feet of counter.
Layout Changes
Keeping the existing layout — sink stays where it is, range stays on the same wall — is the biggest cost-saver in a kitchen remodel. Moving the sink means moving the drain and supply lines: add $1,500–$4,000. Moving the range to an island means gas or electrical work plus a new hood run: add $2,000–$6,000. Removing a wall to open the layout means structural engineering and permits: add $3,000–$8,000.
Appliances (Not In Our Ranges)
Appliances are the one item we don't include in our estimates — they're owner-purchased and vary too much. A basic appliance package (fridge, range, dishwasher, microwave) runs $3,000–$6,000 at retail. Professional-grade appliances (Sub-Zero, Wolf, Thermador) can add $15,000–$40,000 on their own. We coordinate installation to align with your remodel schedule.
Square Footage
Larger kitchens cost more — more tile, more cabinets, more countertop, more labor. But price-per-square-foot is a misleading metric for kitchens because the expensive parts (sink, range, hood, electrical panel work) are fixed costs that don't scale linearly with size. A 100-square-foot kitchen isn't necessarily twice the cost of a 50-square-foot kitchen at the same spec level.
Electrical and Lighting
Adding under-cabinet lighting, upgrading to a dedicated circuit for a new appliance, or running a new outlet to an island are common additions in a mid-range or full remodel. Each runs $300–$800 depending on the panel's remaining capacity. If the panel needs upgrading, that's a separate licensed electrical scope we can coordinate.
Cosmetic Update vs. Full Gut: What Does Your Kitchen Actually Need?
Most homeowners start with a number in mind, then figure out what it buys. Here's how to work the other direction.
Cosmetic Update — $400–$8,000
Hardware swaps, a new faucet, a backsplash behind the range, or a countertop replacement — these are surface-level updates that dramatically change the room's feel without touching the cabinets or layout. The kitchen stays usable throughout. This is the right scope when the cabinets are solid and the layout works, but the finishes are dated.
Good fit: functional layout, solid cabinet boxes, outdated hardware and fixtures. Not a fit: cabinet doors that don't close properly, warped boxes, damaged subfloor, or a layout that genuinely doesn't work for how you cook.
Mid-Range Kitchen Remodel — $12,000–$28,000
New semi-custom cabinets, quartz or solid-surface countertops, tile backsplash, new sink and faucet, updated lighting — all within the existing layout. The kitchen is out of commission for 2–4 weeks. This is the most common scope for Clark County homeowners who want a near-new kitchen without a full gut.
Cabinet lead time — typically 3–6 weeks from order to delivery — drives the schedule. We order as soon as scope is confirmed.
Full Gut Remodel — $25,000–$55,000
Everything comes out. New framing if needed, new electrical runs, new plumbing if the layout changes, new cabinets, new countertops, new flooring, new lighting. The result is a kitchen built exactly to spec with zero compromise on layout. Plan for 4–8 weeks out of the kitchen.
When a gut makes financial sense: If you're planning to stay in the home 7+ years, a full gut remodel amortizes well. If you're selling in 2–3 years, a mid-range update or targeted cosmetic work typically delivers better return per dollar. We'll tell you which scope makes sense for your situation.
Replace, Reface, or Repaint Cabinets?
Cabinets are where most kitchen remodel budgets go. Here's how to think through the decision.
Repaint
$800–$3,000Good fit when
Cabinet boxes are solid, doors are flat (no raised panel routing), and the layout works
Not a fit when
Heavily routed doors (paint collects in grooves), laminate surfaces (paint adhesion is poor), or structural damage
Fastest, cheapest — but only works when everything else is already right
Reface
$3,000–$8,000Good fit when
Boxes are square and structurally solid, you want new door style, layout stays the same
Not a fit when
Water-damaged boxes, warped frames, or you want to add or remove cabinets
Best value when the boxes are good — new look at 40–60% of replacement cost
Replace
$12,000–$28,000Good fit when
Boxes are damaged, warped, or soft; layout change needed; you want to add storage; current cabinets are low-quality particleboard
Not a fit when
Boxes in good shape and layout works — replacement is over-scoping it
The right call when boxes can't be saved or the layout needs to change
How we assess this on-site: We check the box joints, look for soft spots at the base of lower cabinets (water damage from past leaks), open every drawer to check the slides, and assess whether the doors are hanging square. We'll tell you what we find and what makes sense — no pressure either way.
How Long Does a Kitchen Remodel Take?
Kitchen timeline is almost always driven by cabinet lead time and countertop fabrication — not by the on-site work itself.
| Scope | Timeline |
|---|---|
| Hardware / Fixture Swap | 1 day |
| Backsplash Installation | 1–2 days |
| Countertop Replacement | 2–4 days on-site |
| Mid-Range Kitchen Remodel | 2–4 weeks |
| Full Gut Kitchen Remodel | 4–8 weeks |
Cabinet lead time is the most common schedule driver in a kitchen remodel. Norbilt places cabinet orders as soon as scope is finalized — don't wait to start the clock. Countertop templates happen after cabinets are installed, adding 5–10 days for fabrication before countertops go in.
When Do You Need a Permit for a Kitchen Remodel?
No Permit Required
- Hardware replacement — same holes
- Faucet or sink swap — same drain location
- Backsplash tile installation
- Countertop replacement
- Cabinet reface or repaint
- New cabinet installation — same layout
- Light fixture swap on existing circuit
- Flooring replacement
Permit Required
- Moving the sink to a new location
- Relocating the dishwasher drain
- Adding a new electrical circuit
- Moving the range or adding a dedicated circuit
- Removing or modifying a structural wall
- Adding a kitchen island with plumbing or electrical
- Relocating the range hood exhaust path
Norbilt pulls all required Clark County permits before work begins. Permit timeline in Clark County is typically 1–3 weeks for a kitchen remodel — we account for this in your project schedule.
Frequently Asked Questions
Kitchen remodeling in Vancouver WA and Clark County.
01How much does a kitchen remodel cost in Vancouver WA?
+
How much does a kitchen remodel cost in Vancouver WA?
02How long does a kitchen remodel take?
+
How long does a kitchen remodel take?
03Do I need a permit for a kitchen remodel in Clark County?
+
Do I need a permit for a kitchen remodel in Clark County?
04Should I replace or reface my cabinets?
+
Should I replace or reface my cabinets?
05Does the estimate include appliances?
+
Does the estimate include appliances?
06Is your kitchen work warrantied?
+
Is your kitchen work warrantied?
What Clark County Homeowners Say
Real Reviews from Real Projects
“I had a great experience working with Norbilt on my remodeling project. From start to finish, their team was professional, detail-oriented, and easy to communicate with. The quality of work really shows, and the final result turned out even better than I imagined.”
Taylor K.
Vancouver, WA
“I worked with Andrey, who was courteous, professional, efficient, and delivered high-quality work in a timely manner. It's hard to find reliable help these days, and I truly appreciated his attention to detail and expertise.”
M. Taylor
Clark County, WA
“NorBilt did a great job. The work was clean, precise, and finished on time. Everything looks solid and professionally done. Definitely recommend them for quality remodeling work in Clark County.”
David B.
Battle Ground, WA
Portfolio
See Our Kitchen Work
Before-and-after photos from kitchen and bathroom remodels across Clark County — full gut remodels, cabinet replacements, tile work, and more.
The Process
What Happens After You Reach Out
We don't take deposits and disappear. Here's the exact sequence.
01
Free In-Home Walkthrough
We come to the space, assess the existing conditions, and talk through what you want. No obligation, no sales pressure. Usually 30–45 minutes.
02
Written Quote in 24–48 hrs
You get an itemized written quote — not a ballpark. Line items for labor, materials, and any subcontractors. No hidden fees.
03
Materials Ordered Immediately
Once you approve the scope, we order cabinets, countertops, and tile right away. Cabinet lead time is the critical path — we don't wait.
04
Work Starts, You're Updated Daily
You hear from us every day while we're on site. At the end of the project, we walk through together and don't close until you're satisfied.
Your Kitchen,
Built Right
Schedule a free in-home consultation — we come to you, assess the space, and give you a written quote within 48 hours. No pressure, no obligation.
Free walkthrough · Written quote in 48 hrs · 1-year workmanship warranty